Views: 0 Author: Site Editor Publish Time: 2026-07-17 Origin: Site
Wuhan Forward Technology supplied the Gray code positioning systems for 19 overhead cranes across 10 bays at the Algeria cold rolling mill project. The core equipment arrived on site earlier this year. It was shipped on December 1 last year and has since been delivered without issue. In June, our electrical engineers arrived at the site and have begun installation and commissioning. Chinese technology at work on a global production line.